


Mayo Clinic Franklin Heating Station
Mayo Clinic Franklin Heating Station Herzog Engineering assisted the Mayo Clinic install a new boiler at their Rochester Franklin Heating Station. The new boiler was too large to fit through existing openings in the building and a temporary opening in an existing wall...
Orthodontic Clinic
Orthodontic Clinic Most would guess this building is constructed as a steel structure, but it is actually wood construction. Some steel framing was necessary for longer spans, but the walls and roof were framed using wood. Unique connections were utilized to create...
Aspen Dental
Aspen Dental Located in St. Paul, this retail facility houses Aspen Dental as its primary tenant. This was a steel framed building where we were able to reduce construction costs and ensure a smooth process for the contractor due to a comprehensive set of drawings...